TM 5-3895-372-34
a. Preparation (continued).
(27)Remove hydraulic lines.
(28)Remove water pump.
(29)Remove valves and water lines.
(30)Remove main drive system from the upper PTO belt pulley to main clutch.
(31)Remove right angle gear box.
(32)Remove cement drive system.
(33)Remove dry admix bin.
(34)Remove sand and stone screens.
(35)Remove flowmeters.
(36)Remove liquid admix valves, lines, and fittings.
(37)Remove admix injector.
(38)Remove rubber guides.
(39)Remove metal guides and sand deflector.
(40)Remove front seals.
(41)Remove belt wiper.
(42)Remove chain oiled.
(43)Remove sand and stone gates.
(44)Remove sand and stone gates controls
(45)Remove cement meter register cable.
(46)Remove cement meter register.
(47)Remove dry admix hopper.
(48)Remove rear blackout lamps and tail and stoplights.
b. Removal.
(3) Drill 19/32 inch hole in each of the four corner gussets (fig. 2-8) and install four 9/16 inch shank shoulder
eyebolts and nuts.
(4) Remove four bolts (3, fig. 2-9), flat washers (4), lockwashers (2), and nuts (1).
2-23