• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VALVE BANK ASSEMBLY REPLACEMENT
VALVE BANK ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  1155    1156    1157    1158    1159  1160  1161    1162    1163    1164    1165  
img
TM 5-3895-369-14
a.
Removal.
Hydraulic fluid is very slippery and can
cause falls. To avoid injury, wipe up fluid
with rags.
(1) Place a suitable container with a 1 gal.
(3.9 liters) capacity under the valve bank (1)
to catch spilling fluid.
NOTE
Tag and mark hoses before
disconnecting.
Cap all hoses after removal.
(2) Tag, mark, and disconnect four hydraulic
hoses (2,3,4, and 5).
(3) Tag, mark, and disconnect two hydraulic
hoses (6 and 7).
(4) Tag, mark, and disconnect two hydraulic
hoses (8 and 9).
5-493


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.