• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROTOR BOOM REPLACEMENT - Continued
ROTOR ASSEMBLY ON STAND - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  652    653    654    655    656  657  658    659    660    661    662  
img
. . .
TM 5-3895-369-14
4-176. ROTOR ASSEMBLY ON STAND.
This task covers:
a. Installation
b. Removal
INITIAL SETUP
Tools
Personnel Required
MOS62B, Construction equipment repairer (2)
Shop equipment, automotive maintenance and
repair: organizational maintenance common
Equipment Condition
no. 1, less power
TM or Para
Condition Description
Para 4-170
Rotor plow removed.
Lifting device (capacity 5000 1b [2268 kg])
Para 4-174
Rotor assembly removed,
Rotor drive assembly stand (item F3, appendix F)
Wrench, torque
a.
Installation.
Rotor weighs 4200 lbs (1905 kg). Attach
suitable lifting device prior to removal to
prevent possible injury to personnel.
(1) Mechanic operates suitable lifting device
while assistant guides rotor assembly (1) on
rotor stand (2).
NOTE
Screws are from rotor plow assembly.
(2) Install rotor assembly (1) on rotor stand (2)
with four screws (3). Tighten screws
250 lb-ft (339 Nm).
4-561


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.