• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BOOM AND CHAIN REPLACEMENT
ROTOR HOOD LIFT BRACKET REPLACEMENT

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  640    641    642    643    644  645  646    647    648    649    650  
img
. . .
TM 5-3895-369-14
4-170. ROTOR PLOW REPLACEMENT.
This task covers:
b. Installation
a. Removal
INITIAL SETUP
Materials/Parts
Tools
Lockwashers (4)
Tool kit, general mechanic's: equipment
maintenance and repair
Equipment Condition
TM or Para
Condition Description
Shop equipment, automotive maintenance and
Para 2-13
Parking brake set.
repair: organizational maintenance common
Rotor fully raised.
Para 2-10[b]
no. 1, less power
Jackstands (capacity 5,000 lb (2,268 kg])
Wrench, torque
Removal.
a.
Rotor assembly must be supported prior to
working beneath or injury to personnel
may result.
(1) Remove three screws (1) and lo&washers
(2) from plow (3). Discard lockwashers.
(2) Remove plow (3) from beneath gear box (4).
b. Installation.
(1) Position plow (3) on bottom of gear box (4).
(2) Install four lockwashers (2) and
screws (1). Tighten screws
125 to 135 lb-ft (169 - 183 Nm).
NOTE
Follow-on Maintenance:
Remove supports from under rotor.
Lower rotor assembly (para 2-10[c]).
END OF TASK
4-549


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.