• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROTOR BOOM REPLACEMENT
ROTOR ASSEMBLY ON STAND

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  651    652    653    654    655  656  657    658    659    660    661  
img
. .
TM 5-3895-369-14
4-175. ROTOR BOOM REPLACEMENT (CONT).
b. Installation.
Rotor boom weighs 220 lb (100 kg). Use a suitable lifting device when removing boom from vehicle.
(1) While assistant steadies boom (1), mechanic operates suitable lifting device to install boom on tiller (6).
(2) Install two shackles (5), screws (4), castle nuts (3), and cotter pins (2).
(3) Remove lifting device.
NOTE
Follow-on Maintenance:
Remove rotor assembly from stand (4-176).
Install bar stops and springs (para 4-156).
Install hoist boom cylinder (para 4-145).
END OF TASK
4-560


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.