• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROTOR ASSEMBLY REPLACEMENT - Continued
ROTOR BOOM REPLACEMENT - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  650    651    652    653    654  655  656    657    658    659    660  
img
. . .
TM 5-3895-369-14
4-175. ROTOR BOOM REPLACEMENT.
This task covers:
b. Installation
a. Removal
INITIAL SETUP
Personnel Required
Tools
MOS62B, Construction equipment repairer (2)
Tool kit, general mechanic's: automotive
Equipment Condition
Lifting device (capacity 500 lb [227 kg])
Condition Description
TM or Para
Hoist boom cylinder
Para 4-145
Materials/Parts
removed.
Pins, cotter (2)
Bar stops and
Para 4-156
springs removed.
Para 4-176
Rotor assembly on stand.
a.
Removal.
Rotor boom weighs 220 lb (100 kg). Use
suitable lifting device when removing
boom from vehicle.
(1) Attach suitable lifting device to rotor
boom (1).
(2) Remove two cotter pins (2), castle nuts (3)
screws (4), and shackles (5) from boom (1).
Discard cotter pins.
(3) While assistant steadies boom (1), mechanic
operates suitable lifting device to remove
boom from tiller (6).
4-559


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.