TM 5-3895-372-34
(3)
Loosen two retaining clips (2, fig. 2-28) and raise upper access penal (1) and prop open.
(4)
Remove lower access panel (4) by removing three bolts (6) and star washers (5).
(5)
Loosen setscrew (1, fig. 2-29) and disconnect meter register cable (5).
(6)
(7)
Remove cotter pin (4, fig. 2-29) and washer (3). Slide manual handle (2) out of way.
(8) Remove two bolts (7) securing valve mounting bracket (8) to cement feeder (1, fig. 2-30). Place valve
mounting bracket (8, fig.2-29) out of the way for access to cement feeder (1, fig. 2-30) mounting bolts (3).
(9)
Support cement feeder (1) using a pry bar.
(10) For ease of removal of cement feeder (1), remove the four bolts (10) and washers (11) securing the
hammer assembly (12) to the cement feeder (1). Remove hammer assembly (12).
(11) Remove ten bolts (3), washers (17) and nuts (18) securing cement feeder to cement bin (16).
(12) Place two 1" X 2" boards (13) across frame rails (14) to support cement feeder (1).
(13) Lower cement feeder (1) with pry bar.
(14) Drop a suitable rope (2) down through the cement bin (16) and tie to left end of cement feeder (1); one
mechanic holds rope (2) secure at top while second and third mechanics guide cement feeder (1) out from right side of
vehicle.
(15) Remove gasket (15) from vehicle.
LEGEND:
1. UPPER ACCESS PANEL
2. RETAINING CLIP (2)
3. ELECTRICAL CABLE
4. LOWER ACCESS PANEL
5. STAR WASHER (3)
6. BOLT (3)
Figure 2-28. Disconnect/Connect Winch Electrical Cable.
2-43