• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL INJECTION PUMP REPAIR - Continued
FUEL INJECTION PUMP REPAIR - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  922    923    924    925    926  927  928    929    930    931    932  
img
TM 5-3895-369-14
(42) Remove nut (53) washer (54), governor
shaft (55), flyweight holder assembly (57),
washer (58). and shim (59).
(43) Install correct size shim (59).
(44) Install washer (58), flyweight holder
assembly (57) and governor shaft (55).
(45) Repeat steps (39) to (41).
(46) Determine starting stroke adjustment as
follows:
(a) Install block gage with two screws.
Ensure block gage groove faces
governor lever.
(b) Measure starting stroke adjustment at
position E. If measurement not within
limits, perform steps (46) (c)
to (46) (h). if measurement is within
limits, go to step (44).
5-260


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.