• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BOOM HOIST CYLINDER REPLACEMENT - Continued
GATE CYLINDER ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  567    568    569    570    571  572  573    574    575    576    577  
img
. . . . .
TM 5-3895-369-14
4-146. GATE CYLINDER ASSEMBLY REPLACEMENT.
This task covers:
b. Installation
a. Removal
INITIAL SETUP
Materials/Parts
Tools
Fluid, hydraulic (item 23, appendix E)
Shop equipment, automotive maintenance and
Tag, identification (item 55, appendix E)
repair: organizational maintenance common
no. 1, less power
Equipment Condition
Condition Description
TM or Para
Suitable container (capacity 1 gal. [3.8 liters])
Rotor fully lowered.
Para 2-10[c]
Parking brake set.
Para 2-13
Materials/Parts
Pins, cotter (2)
Cloth, lint-free (item 12, appendix E)
Removal.
a.
Hydraulic fluid is slippery and can cause
falls. To avoid injury, wipe up spilled fluid
with rags.
NOTE
Place suitable container with a
1 gallon (3.8 liters) capacity under gate
to catch spilling fluid.
Tag and mark hydraulic hoses before
removal.
(1) Tag, mark and disconnect hydraulic hose (1)
from elbow (2) on gate cylinder (3).
(2) Tag, mark and disconnect hydraulic hose (4)
from elbow (5).
4-476


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.