TM 5-3895-372-10
NOTE
You answer will include decimals to one or two places. Use the nearest half (0.5) number as the
new, re-calibrated Cement Meter Count (for one cubic foot of cement). Enter this figure in the box.
NEW CEMENT METER COUNT
4. Discharge Time
a.
=
Total seconds
Adjusted weight
Time factor
(Step 2)
(from 3b)
(to 4 decimals)
b.
x
94 =
Time Factor
New Time
(from a)
NOTE
Your answer will include decimals to one or two places. Use the nearest half (0.5) as the new, re-
calibrated time in seconds to discharge one cubic foot of cement. Enter this figure in the box.
NEW TIME
2-3. Initial Guidelines.
Before you operate the mobile mixer, you should
a. Perform your before (B) PMCS. If necessary, notify Organizational Maintenance of problems.
b. Know how to use the mixer safely and efficiently.
c. Be sure you know what ingredients and what mix design you should use.
2-22