• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fig. 6 - Checking Solenoid Pull-In Winding.
Fig. 1 - Typical Instrument Panel.

Technical Manual For Mixer, Rotary Tiller, Soil Stabilization Diesel Engine Driven (Ded) Page Navigation
  437    438    439    440    441  442  443    444    445    446    447  
img
. . .
TM 5-3895-359-14&P
2. Momentarily flash a jumper lead from terminal G to
Install Starting Motor
terminal MTR. (Fig. 8). The drive will now shift into
cranking position and remain so until the battery is
To install the starting motor, reverse the procedure
disconnected.
outlined for removal.
Tighten the 5/8"-11 starter
attaching bolts to 137-147 lb-ft (186-200 Nm) torque.
3.
Push the pinion or drive back towards the
Keep all of the electrical connections clean and tight. en
commutator end to eliminate slack movement.
installing wiring terminal leads to the starting motor and
4.  Measure the distance between drive and housing
the solenoid switch, tighten the No. 10-32 connections
(Fig. 8).
to 16-30 lb-in (2-3 Nm) torque and the 1/2"-13
connections to 20-25 Ib-ft (27-34 Nm) torque.
5. Adjust clearance by removing plug and turning shaft
nut (Fig. 8).
Fig. 8 - Measuring Pinion Clearance.
10-8-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.