TM 5-3895-342-12
d. Disconnect water valve wrench retainer as
Figure 2-4. Water valve wrench retainer.
Figure 2-2. Disconnect hauling stub.
e. Set the water gauge indicator lever for the
amount of water to be discharged into the drum
(fig. 2-5E).
f. Set up a barrel for the pump suction hose rather
than dropping hose directly into a ditch or water
hole. Provide an ample supply of water to mix the
concrete required to clean and flush the concrete
mixer after operation has ceased.
g. If the mixer is new, it will be necessary to prime
initial priming, the pump should retain enough
water to be self-priming.
Figure 2-3. Skip hook.
Section II. MOVEMENT TO A NEW WORK SITE
2-3. Preparation for Movement
a. Drain water from water tank.
b.
Connect retainer to
end of
water valve wrench in
reverse of
instructions on
figure 2-4.
c. Remove all concrete deposits from the exterior surface of mixing drum.
d.
Connect skip hook to
skip in
reverse of
instruction, on
figure 2-3.
e.
Loosen the adjusting screws at
the end of
each axle, spring in
reverse of
instructions on
figure 2-1.
f. Connect hauling stub to
fifth wheel in
reverse of
instructions on
figure 2-2.
g. For short distance moves, tow mixer at speed not to exceed 20 MPH. Load mixer on flat bed truck or
railway car for medium or long-distance moves.
2-4. Setting Up at New Work Site
Change 1
2-2