• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROTOR TINE REPLACEMENT
ROTOR ASSEMBLY REPLACEMENT

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  644    645    646    647    648  649  650    651    652    653    654  
img
. .
TM 5-3895-369-14
NOTE
This procedure is the same for both
left- and right-hand tines.
Left- and right-hand tines must be
installed correctly for proper rotor
operation. Remove and replace all
left-hand or all right-hand tines at one
time to avoid incorrect installation.
(2) Remove 60 locknuts (2), carriage bolts (3),
and 30 tines (4) from 10 tine plates (5).
b. Cleaning/Inspection.
(1) Inspect mounting areas on tine plates for
damage.
(2) Replace all tines as a set.
Installation.
c.
NOTE
Install all left-hand or all right-hand tines
at one time to avoid incorrect installation.
(1) Install 30 tines (4) on 10 tine plates (5) with
60 carriage bolts (3) and locknuts (2).
Tighten locknuts 260 to 280 lb-ft
(352 -380 Nm)
(2) Remove supports from rotor assembly (1).
NOTE
Follow on Maintenance:
Connect negative battery cables
(para 4-90).
Lower rotor assembly (para 2-10[c]).
END OF TASK
4-553


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.