• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROTOR PLOW REPLACEMENT
ROTOR SPRING REPLACEMENT

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  641    642    643    644    645  646  647    648    649    650    651  
img
. .
TM 5-3895-369-14
4-171. ROTOR HOOD LIFT BRACKET REPLACEMENT.
This task covers:
b. Installation
a. Removal
INlTlAL SETUP
Materials/Parts
Tools
Lockwashers (4)
Tool kit, general mechanic's: equipment
maintenance and repair
Equipment Condition
Condition Description
TM or Para
Shop equipment, automotive maintenance and
Rotor hood removed.
Para 4-161
repair: organizational maintenance common
no. 1, less power
Wrench, torque
Removal.
a.
(1) Remove four screws (1) and lo&washers (2)
from rotor hood guard (3). Discard
lockwashers.
(2) Remove rotor hood guard (3) from gear
box (4).
b. Installation.
(1) Position rotor hood guard (3) on
gear box (4).
(2) Install four lockwashers (2) and screws (1) in
rotor hood guard (3). Tighten screws
90 to 100 lb-ft (122 - 135 Nm).
NOTE
Follow-on Maintenance: Install rotor hood (para 4-161).
END OF TASK
4-550


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.