• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR INLET PIPE REPLACEMENT
MANIFOLD COVER REPLACEMENT - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  295    296    297    298    299  300  301    302    303    304    305  
img
. . . . .
TM 5-3895-369-14
4-46. MANIFOLD COVER REPLACEMENT.
This task covers:
c. Installation
b. Cleaning/Inspection
a. Removal
INITIAL SETUP
Equipment Condition
Tools
Condition Description
TM or Para
Shop equipment, automotive maintenance and
Turbocharger air inlet
Para 4-43
repair: organizational maintenance common
hose removed.
no. 1, less power
Injector fuel lines
Para 4-47
removed.
Wrench, torque
General Safety Instructions
Materials/Parts
If engine has recently been in operation, allow
Cloth, lint-free (item 12, appendix E)
time for cooling before performing procedure.
Compound, sealing, pipe thread (item 17,
appendix E)
Solvent, drycleaning (item 54, appendix E)
Gasket, manifold
Removal.
a.
NOTE
Valve covers removed for clarity.
(1) Loosen clamp (1) and remove inlet
connection (2).
NOTE
Three of 14 screws were removed with fuel
line support bracket.
(2) Remove 11 screws (3), manifold cover (4)
and gasket (5) from cylinder head (6).
Discard gasket.
4-204


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.