TM 5-3895-372-34
(8)
Remove fluffer air hose (1, fig. 2-35) at both ends, piping (2), and fluffer hose (4).
(9)
Disconnect electrical power cable (3).
(10) Remove the six bolts and nuts (5 and 9, fig. 2-33) attaching the rear accessory mounting frame (10) to
the cement bin (12).
(11) Attach a suitable four point cable or chain sling (minimum capacity 700 lbs) to the four eyebolts installed
in step 3.
(12) Using a suitable lifting device, raise sling until taut, but not lifting any weight.
(13) Using a suitable acetylene torch, cut spot welds at the edges of bracket (1, fig. 2-36) on both sides of
(14) Remove four bolts and nuts (7) (two on each side).
(15) Remove four capscrews (6) (two on each side) retaining bin uprights to subframe.
(16) Remove cement bin (12) from vehicle.
Installation.
c.
(1)
Set cement bin (12) in place on vehicle.
(2) Install four capscrews (6) (two on each side) retaining cement bin uprights to subframe.
Tighten
capscrews securely.
(3)
Install four bolts and nuts (7) (two on each side). Tighten securely.
(4)
Weld brackets on both sides of bin that were cut at time of removal (1). (Refer to TM 9-237.)
(5)
Remove sling and lifting device.
(6) Install the six bolts and nuts (5 and 9) that attach the rear accessory mounting frame to the cement bin
(12) and tighten securely.
(7)
(8)
Install fluffer air hoses (1 and 4) and piping (2).
(9)
Install winch cable pulley with four capscrews (8, fig. 2-33). Tighten capscrews securely.
(10) Install the dry admix hopper and secure with two bolts and nuts (2, fig. 2-34) and two bolts and nuts (1).
Tighten all bolts securely.
(11) Install the ladder (11) and secure with two bolts and nuts (4, fig. 2-33). Tighten bolts securely.(12)
Install six bolts and nuts (2 and 3) attaching the ladder to the top of the cement bin (12). Tighten bolts securely.
(13) Weld brackets (1) to the cement bin (12). (Refer to TM 9-237.)
(15
Install clearance lights. (Refer to TM 5-3895-372-20.)
2-50