TM 5-3895-372-10
Figure 3-17. Chain Oiler.
CAUTION
Some cement will already be on the belt. However, no new cement should be
delivered. If the meter register turns after you engage the main clutch, stop
operation. Check that the cement clutch is fully disengaged (fig. 3-15).
(4) Adjust the throttle until the tachometer reads 1620-1720 rpm (fig. 3-18). Open the control valve. Engage
the main clutch.
NOTE
Be sure you are in an area suitable for dumping sand and stone. Aggregates will
be carried down the main conveyor belt and thought the mixing trough to flow out
the motor end.
TA 075564
3-59