TM 5-3895-372-10
Table 3-1. Operator/Crew Preventive Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
W - Weekly
M - Monthly
OPERATOR PMCS - M919 CONCRETE MOBILE MIXER BODY
Item
Interval
ITEM TO BE INSPECTED
FOR READINESS REPORTING
Procedure: Check For And Have Repaired
Equipment is not Ready/
No.
B
DAWM
Filled Or Adjusted As Needed
Available If:
50
Check the quick acting valves for leaks and
ease of operation.
51
Check flowmeter for oper-
Flowmeters inoperative.
ation.
52
Check strainer If clogged,
replace.
TA 075539
3-27