TM 5-3895-372-10
CAUTION
Clean the mixer and lubricate the mixing auger bearings whenever you stop concrete production.
Do not wait until the end of the day.
d. Disengage the PTO. See TM 9-2320-273-10.
f. Close the Air Shutoff Valve. (See fig. 2-43.) Turn it all the way clockwise.
g. Remove and Stow the Delivery Chutes. (See fig. 2-44.)
Figure 2-43. Air Shutoff Valve.
TA 075508
2-58