TM 5-3895-369-14
4-95. TWO-SPEED LINKAGE REPLACEMENT/REPAIR.
This task covers:
a. Removal
c. Cleaning/Inspection
b. Disassembly
d. Assembly
e. Installation
INITIAL SETUP
Tools
Tool kit, general mechanics: automotive
Materials/Parts
Solvent, drycleaning (item 54, appendix E)
Pin, Cotter
Locknut
Equipment Condition
TM or Para
Para 4-132
Para 2-15
Para 4-94
Condition Description
Forward floor plate
removed.
Aft floor deck raised.
Two-speed shift lever
removed.
a.
Removal.
(1)
Remove cotter pin (1) and pin (2) from
clevis (3) on two-speed control lever (4) and
separate clevis from lever. Discard cotter
pin.
(2)
Loosen nut (5) and remove cable
assembly (6) from mounting bracket (7).
4-351