• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL INJECTION PUMP REPLACEMENT - Continued
ENGINE LOW IDLE SPEED ADJUSTMENT

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  897    898    899    900    901  902  903    904    905    906    907  
img
. . . . .
TM 5-3895-369-14
(7) If installing new injection pump (3), take up
gear lash by rotating pump against direction
of gear rotation.
(8) If installing new injection pump (3), tighten
three nuts (13) 216 lb-in (24 N-m).
Permanently mark new injection pump to
align with mark on gear housing.
(9) If installing used injection pump (3), rotate
injection pump to align scribe marks and
tighten three nuts (13) 216 lb-in (24 Nm).
(10) Remove timing lock washer (8) from
injection pump (3).
(11) Loosen timing lock screw (7) and install
timing lock washer (8). Tighten screw
84 lb-in (10 Nm).
(12) Install brace (5) with three screws (4 and 2). Tighten screws 216 lb-in (24 Nm).
NOTE
Follow-on maintenance:
Install gear cover (para 5-26).
Install shutdown solenoid (para 4-41).
Install fuel control throttle and bracket (para 4-56).
Install injection pump fuel lines (para 4-47).
Bleed fuel system (para 4-54).
END OF TASK
5-235


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.