TM 5-3895-369-14
e.
Installation.
(1) Install two spacers (16) on studs (17).
(2) Install two clamps (18) and cross (6) on two
studs (17).
on studs (17).
(4) Connect hose (12) on king nipple (13) and
tighten clamp (11) on cross (6).
(5) Connect hose (10) and tighten fitting (9).
(6) Connect hose (8) and tighten fitting (7).
(7) Connect hose (5) and tighten fitting (4) on
cross (6).
(8) Connect hose (1) on fitting (2) of flow
control valve (3).
(9) Remove container and dispose of hydraulic
fluid in accordance with local regulations.
NOTE
Follow-on maintenance:
Install forward floor plate
Check hydraulic fluid level and add
END OF TASK
4-483