• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Mixing Operation Shut-down Procedures
Turn Around Procedures

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  50    51    52    53    54  55  56    57    58    59    60  
img
. . .
TM 5-3895-369-14
2-12. ADDITIVE SYSTEM OPERATING PROCEDURES.
The additive system provides the capability of adding several types of additive solutions to soil during mixing
operations. The following procedures provide instructions for operating and shutting down the additive system.
Descriptions of controls called out in these procedures can be found in Table 2-1, Controls and Indicators.
a. Additive System Operation.
(1) Swing additive boom (1) to front of vehicle.
(2) Connect additive supply hose from remote vehicle to additive pump (2).
(3) Push THROTTLE control lever (3) forward toward PULL position until the required engine speed is
reached (Table 2-3).
(4) Push spray bar control lever (4) forward to PUMP ON/SPRAY ON position and hold for 5 seconds to
open spray bar (5), then release lever.
(5) Place GROUND SPEED (FPM) meter switch (6) in ON position.
(6) Set pump speed control (7) to position 8.
(7) Start mixing operation (para 2-211).
(8) Place pump speed control switch (8) in SPRAY ON position.
2-38


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.