• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fig. 8. Checking Pre-Load of Idler Gear Bearing
Fig. 1. Removing Crankshaft Timing Gear

Technical Manual For Mixer, Rotary Tiller, Soil Stabilization Diesel Engine Driven (Ded) Page Navigation
  260    261    262    263    264  265  266    267    268    269    270  
img
.
TM 5-3895-359-14&P
7.
Check the backlash between the mating gears.
NOTE: Make sure the oil passage in
The backlash must be .002 " to .008 " between new
the cylinder block is plugged at the
gears and must not exceed .010 " between used gears.
dummy hub location.
8.
No gasket is used between the roller bearing type
Install the flywheel housing as outlined on Page 10-2-76
idler gear assembly and the flywheel housing.
10-2-122


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.