TM 5-3895-372-10
Table 3-1. Operator/Crew Preventive Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
W - Weekly
M - Monthly
OPERATOR PMCS - M919 CONCRETE MOBILE MIXER BODY
Item
Interval
ITEM TO BE INSPECTED
FOR READINESS REPORTING
Procedure: Check For And Have Repaired
Equipment is not Ready/
No.
B
DAWM
Filled Or Adjusted As Needed
Available If:
11
Visually check angle gear box for leaks.
Check oil level. It should be to oil level
plug. Check fill cap breather hole and
clean if required.
WATER SYSTEM
12
Using the sight gage, check for
sediment in tank. Empty and flush if
needed.
13
Check inlet strainer (tank), if clogged,
clean it.
TA 075521
3-9