TM 5-3895-369-14
2-11. ROTOR OPERATING PROCEDURES.
a.
Introduction. The following paragraphs provide instructions for operating the rotor assembly and preparing
soil road construction. Descriptions of controls called out in these procedures can be found in Table 2-1, Controls and
Indicators.
b. Mixing Operation Procedures.
Hearing protection is required for operator and also for all personnel working in and around this vehicle
while vehicle is operating.
(1)
Start vehicle (para 2-9).
(2)
Drive vehicle to job site (para 2-10).
(3)
Stop vehicle (para 2-10[c]).
(4)
Pull THROTTLE control lever (1) to IDLE position.
(5)
Push tailboard control lever (2) forward to RAISE TAILBOARD position until tailboard (3) is
fully raised.
(6)
Set 2-speed lever (4) in LOW range position.
2-34