TM 5-3895-369-14
5-83. VALVE BANK ASSEMBLY REPLACEMENT (CONT).
(6)
Connect two hydraulic hoses (8 and 9) to
valve bank (1).
(7)
Connect two hydraulic hoses (6 and 7) to
valve bank (1).
(8)
Connect four hydraulic hoses (2,3,4, and 5)
to valve bank (1).
NOTE
Follow-on Maintenance:
Install flow control bank assembly (para 4-138).
Install valve bank assembly control levers and linkage (para 4-139).
END OF TASK
5-496