TM 5-3895-369-14
5-74. REAR BEARING, HUB, AND BRAKE DRUM REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Tool kit, general mechanics: equipment
maintenance and repair
Personnel Required
MOS62B, Construction equipment repairer (2)
References
Wrench, spanner, 3-pin (para F-6, appendix F)
Wrench, torque
TM 9-214, Inspection, Care, and Maintenance of
Antifriction Bearings
Equipment Condition
Lifting device (capacity 500 lb [227 kg])
Materials/Patts
Seal, oil
Cloth, lint-free (item 12, appendix E)
Solvent, drycleaning (item 54, appendix E)
TM or Para
Condition Description
Para 5-65
Wheel end and axle shaft
removed.
General Safey Instructions
Brake shoes contain asbestos; wear proper
protective equipment.
5-433