• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY LEVEL INSPECTION - Continued
GROUND WIRE REPLACEMENT - Continued

Maintenance Manual For Mixer, Rotary Tiller Page Navigation
  437    438    439    440    441  442  443    444    445    446    447  
img
. .
TM 5-3895-369-14
4-92. BATTERY TESTING.
Reference TM 9-6140-200-14, Operator's Organizational, Direct Support, and General Support Maintenance Manual
for Lead Acid Storage Batteries.
4-93. GROUND WIRE REPLACEMENT.
This task covers:
c. Installation
b. Cleaning/Inspection
a. Removal
INITIAL SETUP
Equipment Condition
Tools
Condition Description
Tool kit, general mechanic's: automotive
TM or Para
Para 4-132
Forward floor plate
removed.
Materials/Parts
Negative battery cable
Para 4-90
Lockwasher
disconnected.
Locknut
Removal.
a.
(1) Remove locknut (1), screw (2) and ground wire (3) from firewall mount (4). Discard locknut.
(2) Remove screw (5), lockwasher (6), and ground cable (3) from clutch housing (7). Discard lockwasher.
4-346


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.